FISinter (to initial point)
Code Page utf-8
Federative information system of producers on products and services
FISinter

Архив подсистемы «Информация производителей продукции»

Select Language
Information Search
Details
Настройки браузера
Подсистема

Building materials, structures, buildings and installations

Glue tile 25

 
Country: Russia
 
 Supplier: Producer  
 supplier's details  Product identifiers

Explanation/Annotation:

Bonding solution on cement base for tile paving wall-mounted and on llamas. For internal and superficial works. Ìîðîçîóñòîé÷èâ and âîäîóñòîé÷èâ. |

Detailed model description:

For laying of tiled, ceramic and tesserae wall-mounted and p îëû from concrete, light concrete, on brick brick-work, on plasters, waters îñòîéêèå putties and gypsum board liners in dry, wet and wet on ìåùåíèÿõ. Serves for tile paving in basins, shower-room, and bath to ìíàòàõ. the foundation preparing the foundation should be clean and hard. ÏåñîêÁ dust, butter and other waters îîòòàëêèâàþùèå substances must be removed. In case of external works ïîâå ðõíîñòü shall have the mineral foundation. In case of tile paving of íåçíà÷èòåë the üíûå surfaces it levels off glue. the mixing the sack 25 kg is combined with 5, 5-6, 0 water l with the help of electric mixer. the dry mixture and after solution mixing give îòñòî to ÿòüñÿ 10 ìèíþ after which time the solution again to mix put in water and it is ready for work. solution viability more than three of hrs.. the tile paving the solution is deposited on the basis by the plain end of spatula, and then ðàñïðîñ òðàíÿåòñÿ over the surface notched by the end. The solution one should rule n and such area, which it is possible îáëèöåâàòü pallet during 15 minute. Punched tape èòêà densely is placed wall-mounted and small movements is forced down into in solution. To recovery the pallet provision it is possible within minute. For íàè best bondability it is necessary to achieve right proportions and the napa drawing ðàâëåíèÿ on reverse side of pallet and cutting file on spatula. Âðå drying ìÿ of glue 1-3 day. Walking possibility on sex, faced pallet not earlier three of days after completion the work. material consumption according to type of foundation and pallet, the material consumption make up 2-4 êã/êâ. M. Unconsolidated the material ñìûâàåòñÿ water, hardened the mf (medium frequency) ùàåòñÿ mechanically. packaging and the storage is supplied in double polythene bags on 25 kg. Is saved in dry location during 6 months.

Conditions of delevery:

Price: agreed per itm