FISinter (to initial point)
Code Page utf-8
Federative information system of producers on products and services
FISinter

Архив подсистемы «Информация производителей продукции»

Select Language
Information Search
Details
Настройки браузера
Подсистема
Firma "TRANSGIDROSTROY", OOO
Firma "TRANSGIDROSTROY", OOO

Russia, 117218, Moscow, Moscow, ul. Krzhizhanovskogo d. 20/30, korp. 1
Phone120-51-92
Fax
Legal organizational formLTD
foundation year
Web address:
Federative Web-address:www.fisinter.org/990
E-mail:
ChiefSamsonov Arkady Vasilyevich

Scope of activity

Services telephones

Bank particulars

 Additional information


Supplies:
         Construction and design and exploration work   
         •   Activity starting-up and adjustment RP SAS     RP SAS
         •   Adjustment system NS VKV     NS VKV
         •   Arrangement air-conditioner UK     UK
         •   Arrangement bottom UDM     UDM
         •   Arrangement channel UKM     UKM
         •   Arrangement coating UP BMCM     UP BMCM
         •   Arrangement floor UP     UP
         •   Arrangement floor UP KP     UP KP
         •   Arrangement floor UP LP     UP LP
         •   Arrangement floor UPP/2     UPP/2
         •   Arrangement foundation UOS     UOS
         •   Arrangement gallery UGM     UGM
         •   Arrangement layer USP/2     USP/2
         •   Arrangement lining UK SHST     UK SHST
         •   Arrangement lining UO ST     UO ST
         •   Arrangement roofing UKR/2     UKR/2
         •   Arrangement tray ULM     ULM
         •   Arrangement tunnel UT OSZH     UT OSZH
         •   Arrangement tunnel UTM     UTM
         •   Arrangement valve UKO NS     UKO NS
         •   Arrangement wall US VVZH     US VVZH
         •   Arrangement waterproofing UGO BKK     UGO BKK
         •   Arrangement waterproofing UGO/3     UGO/3
         •   Arrangement well UK VKV     UK VKV
         •   Assembling bearer MO     MO
         •   Assembling clamp MH     MH
         •   Assembling door MD     MD
         •   Assembling fan MV     MV
         •   Assembling framework MR     MR
         •   Assembling gates MV     MV
         •   Assembling hatchway ML     ML
         •   Assembling manhole ML     ML
         •   Assembling partition MP     MP
         •   Assembling pipeline MT PTLS     MT PTLS
         •   Assembling platform MP     MP
         •   Assembling pole MS     MS
         •   Assembling stained glass MV     MV
         •   Assembling stairway ML     ML
         •   Assembling structural unit MK KZS     MK KZS
         •   Assembling unit MVA     MVA
         •   Assembling window MO     MO
         •   Assembly collector SKV     SKV
         •   Building up mortgage MZ     MZ
         •   Colouring facade OF/2     OF/2
         •   Colouring premises OP     OP
         •   Colouring surface OP MK     OP MK
         •   Design lining RK SHST     RK SHST
         •   Disassembling collector DKV     DKV
         •   Drifting chamber PKSH     PKSH
         •   Drifting chute PF     PF
         •   Drifting course PV     PV
         •   Drifting shaft PSSH     PSSH
         •   Drifting test pit PSH     PSH
         •   Drifting tunnel PT     PT
         •   Drilling exploration BR     BR
         •   Erection beam VBZH/2     VBZH/2
         •   Erection bulkhead VPZH/2     VPZH/2
         •   Erection column VKZH/2     VKZH/2
         •   Erection ledgement VPZH/2     VPZH/2
         •   Erection overlapping VPZH/2     VPZH/2
         •   Errection foundation UFZH     UFZH
         •   Excavation common RGM ekskav/4     RGM ekskav/4
         •   Excavation common RGM vyvoz     RGM vyvoz
         •   Excavation common RGM/4     RGM/4
         •   Extraction of well point IIO     IIO
         •   Facing surface OP KP     OP KP
         •   Fillup aperture ZP OD     ZP OD
         •   Fillup aperture ZPPR     ZPPR
         •   Gasket air-duct PV LS     PV LS
         •   Glazing door ODD     ODD
         •   Glazing window OKD     OKD
         •   Handling earth RGM     RGM
         •   Heat-Insulation keramzite TKSM     TKSM
         •   Immersion well point PIO     PIO
         •   Input switchboard VSHZ     VSHZ
         •   Installation of gate UV     UV
         •   Laying brick KKS/2     KKS/2
         •   Laying of block UB FC/3     UB FC/3
         •   Laying pipe PT CHKT     PT CHKT
         •   Lead-out switchboard VSHZ     VSHZ
         •   Lining umbrella PZ LS     PZ LS
         •   Mounting compensator UK     UK
         •   Mounting dehydrator UV     UV
         •   Mounting filter UF     UF
         •   Mounting panel UP SNV     UP SNV
         •   Mounting stopcock UZ     UZ
         •   Mounting stopcock UZ NS/2     UZ NS/2
         •   Mounting structure UKD     UKD
         •   Mounting valve UKO     UKO
         •   Papering ceiling OP OL     OP OL
         •   Papering wall OS OL     OS OL
         •   Pipe fitting MT ST     MT ST
         •   Pipe fitting UT ACT     UT ACT
         •   Pipe fitting UT ANT     UT ANT
         •   Pipe fitting UT BPT     UT BPT
         •   Pipe fitting UT CHNT/3     UT CHNT/3
         •   Pipe fitting UT SB     UT SB
         •   Pipe fitting UT ST     UT ST
         •   Pipe fitting UT ZHBT/2     UT ZHBT/2
         •   Pipe fitting UT ZHNT/2     UT ZHNT/2
         •   Plaster facade SHF KB     SHF KB
         •   Plastering surface OP ITI     OP ITI
         •   Plastering surface SHP VZ     SHP VZ
         •   Rigging framework UKD     UKD
         •   Rigging reinforcement UA MZHK/3     UA MZHK/3
         •   Rigging roof timbers USD     USD
         •   Setting chair USD     USD
         •   Testing of pipelines IT PG/2     IT PG/2
         •   unit oil separation UM     UM
         •   Warmth-keeping slab UP     UP
         •   Wiring network PS NO     PS NO
         •   Wiring wirework PE     PE

Data open till:31.12.2010

16276/16276/87